CLIENT requests and authorizes CH2M HILL to perform the following services:
SCOPE: Provide Engineering Services to study the collection system
odor problem as further detailed in the attached letter _
dated November 13 1990 .
COMPENSATION by the CLIENT to CH21M HILL to be on the basis of information included in
Attachment A.
When compensation is on a cost-reimbursable basis,a service charge of 10 percent will be added to Direct Expenses.
All sales, use,value added,business transfer,gross receipts,or other similar taxes will be added to CH21VI HILL'S compen-
sation when invoicing CLIENT.
OTHERTERMS CH2M HILL NORTHWEST , INC . will make reasonable effort to
complete the work within the established budget and will keep
the City of Kent informed of progress toward that end so that
the budget or work effort can be adjusted if found necessary.
Services covered by this AGREEMENT will be performed in accordance with the PROVISIONS stated on the back of this
form and any attachments or schedules.This AGREEMENT supersedes all prior agreements and understandings and
may only be changed by written amendment executed by both parties.
Approved for CLIENT Accepted for CH2M HILL NORTHWEST INC.
By By
Title ���`� w"" j �JU Title
Date �f�j.,� � Date 7 jl
REV 10/90 FORM 124
1 of 1
ATTACHMENT A
Attachment A to the AGREEMENT between CH2M HILL NORTHWEST INC., (the
"ENGINEER"), and CITY OF KENT, Washington, (the"OWNER") for a PROJECT
generally described as:
Engineering services to study collection system odor problems.
COMPENSATION
Compensation by the CLIENT to CH2M HILL to be on the basis of actual labor and
direct expenses (cost-reimbursable), with labor billed at a multiplier of 2.2 times salary
cost. A budgetary amount of Four Thousand Five Hundred Dollars ($4,500) is hereby
established for these services. A breakdown of the expected labor and expense costs for
the work is as follows:
Professional Services:
Senior Engineer 48.0 hrs @ $28.34 $1,360.32
Office Services 2.0 hrs @ $11.20 22.40
$1,382.72
$1,382.72 X 1.43 X 2.2 = $4,350.00
(raw salary) (salary (overhead
cost) and profit)
Expenses:
Auto mileage $ 50.00
Computer 75.00
Miscellaneous 25.00
$ 150.00
Total Budget: $4,350.00 + $150.00 = $4,500.00
(labor) (expenses)
Engineers �� •'
- Planners
Economists
- Scientists
November 13 , 1990
SEA203 .MW
Mr. Nelden Hewitt
Department of Utilities
City of Kent
5821 S. 240th
Kent, Washington 98032
Dear Mr. Hewitt
, Subject: Proposal for Professional Engineering Services
Collection System Odor Control Study
We appreciate the opportunity to submit this proposal to you
for studying and identifying methods to eliminate the
wastewater odors in the Kent collection system. Based on our
conversations, and the tour that Lyle provided last Tuesday,
we have developed an approach to resolve the odor problem.
This approach is presented in the following task
descriptions.
Task 1 - Problem Definition
Based on the information we already have, combined with a
summation of your on-going sulfide sampling results, we
believe that the problem is already substantially defined.
Existing evidence indicates that the major odor and corrosion
problems occur in the part of the collection system that
drains the Soos Creek system. We therefore believe that the
Soos Creek discharge is the primary contributor to the odor
and corrosion problems in the Kent Collection System
downstream.
For Task 1 we will evaluate and summarize the existing data
and information and confirm our opinion as to the source of
the odors. If necessary, we will recommend additional
sampling to provide confirmation of the source of odors.
206.453.5000
CH2M HILL Seattle Office p Box 91500,Bellevue, Washington 9800t9-2050
City of Kent
Page 2
November 13, 1990
SEA203 .MW
Task 2 - Alternatives Analysis
For Task 2 , we will identify and evaluate the alternatives
available for reducing odors in the systems. The most
promising alternatives for your situation are a combination
of source control on the Soos Creek force main and vapor
phase sulfide controls on selected manholes downstream from
the Soos Creek discharge. There are several alternatives
available to Soos Creek to reduce the sulfide level in their
wastewater, which we will identify as part of our work. It
is customary, when one utility discharges wastewater through
another utility, to establish maximum sulfide limits on the
wastewater before it enters the second utility. The normal
sulfide levels that are specified for this range between 0. 5
and 1.0 mg/1. Even if concentrations are controlled to these
levels, we likely will recommend that selected manholes in
your system have activated carbon canister inserts installed
to allow for odor controlled ventilation.
Task 3 - Report
The problem definition and alternatives analysis will be
summarized in a report that clearly states observations,
findings, evaluations, and recommendations. It will include
recommendations that will be applicable to both the City of
Kent system and the Soos Creek system. In addition, it will
provide sampling and analysis protocols, should it be
determined that more sampling is required.
We estimate the cost to perform the three tasks as described
briefly above will be no more than $4 , 500, including labor
and expenses. It will be completed within two weeks of your
authorization. We anticipate at least one additional visit
to collect your existing sulfide sampling data. Should
additional sampling be required, we complete a her the train sampling
staff to complete the sampling,
ourselves (at extra cost) , or you can arrange to have others
take samples and analyze them for you.
We have found the as-built drawings of the collection system
in the vicinity of the odor problems to be a valuable
information resource. We plan to return these drawings when
we come to collect your existing sulfide sampling data.
Please let us know if you need to have the drawings returned
sooner.
City of Kent
Page 3
November 13 , 1990
SEA203 .MW
Thank you for the opportunity to submit this proposal to you.
We are looking forward to working with you on this project.
Sincerely,
Thomas R. Card
Project Manager
Karen Hood
Senior Process Engineer
CITY OF
Dan Kelleher, Mayor
Don E. Wickstrom, P.E., Director of Public Works
The City of Kent Celebrates Its First 100 Years
".FY�1II!��h�
CH2 M HILL
777 108th Avenue NE
P.O. Box 91500
Bellevue, Washington 98009-2050
ATTENTION: Karen Hood
Senior Process Engineer
SUBJECT: Contract for Collection System Odor Control Study
Enclosed is a signed contract for Engineering Services for the Odor Control Study.
Also, this letter is authorization to proceed. Please contact me on the date you plan
to start.
Sincerely
Tim Heydon, P.E.,
Operations Manager
N11den D. Hewitt
Utilities Superintendent
NH/map
cc: Don Wickstrom, Director of Public Works
Enclosure: Contract
S055C04
220 4th AVE. SO., /KENT,WASHINGTON 98032-5895 i ENGINEERING (206)859-3383/OPERATIONS(206)859-3395/FAX#859-3334