CONTRACT MODIFICATION AGREEMENT NO. ONE
PROJECT Reiman Trust Property Environmental Assessment, Phase II
CONSULTANT AGI Technolaies
DATE January 27 2000
THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE
PARKS AND RECREATION DEPARTMENT AGREEMENT FOR REIMAN TRUST
PROPERTY ENVIRONMENTAL ASSESSMENT, PHASE II (the "Contract") entered into
between the City of Kent and AGI Technologies on December 28, 1999
All provisions in the Contract shall remain in full force and effect except as expressly modified by
this document
Whereas additional services requested are beyond the existing scope of tasks as described in the
executed agreement with the City of Kent dated December 28, 1999 the City of Kent and AGI
Technologies desire to modify the Contract, $2,500 00
For valuable consideration and by mutual consent of the parties, the modifications to the Contract
are as follows
Section II. Pavment, is modified as follows The City shall pay the Consultant based on time and
materials an amount not to exceed Two Thousand Five Hundred Dollars and NO/100ths ($2,500 00)
for these modifications according to the schedule of charges attached as Exhibit A, which causes the
total contract amount based on time and materials, including all agreed upon modifications to be
Sixteen Thousand Two Hundred Dollars and NO/100ths (S16.200 00) for the work described in
Exhibit A
Section III. The Consultant shall evaluate alternative clean-up methods and recommend remedial
action
The Consultant will complete the work described in this Contract Modification Agreement per
telephone conversation of January 24. 2000 in order to meet the City of Kent schedule
Consultant accepts all requirements of this Contract Modification by endorsing below Consultant
further agrees that this Contract Modification constitutes full payment and final settlement of all
claims for contract time and for all costs of any kind, including costs of delays, related to any work
either coveted or affected by this Contract Modification
The parties whose names appear below swear under penalty of perjury that they are authorized to
enter into a contract modification that is binding on the parties of this contract
Contract Modification I of 2 01/27/00
AGI Technologies
Reiman Environmental Assessment, Phase II
IN WITNESS WHEREOF, the parties have executed this Contract Modifications on the day and
year first written above
AGI TEC NOLOGIES THE CITY OF "ENT
BY ; �
" BY T
ncipal ohn odgson, Par s Director
Date
Ot—C/ — o0
Contract Modification 2 of 2 01/27/00
AGI Technologies
Reiman Environmental Assessment, Phase II
Exhibit A
AGI
TKHNOLOGIES
Schedule of Charges
Personnel
Principal $ 110 - 160 per hour
Associate 95 - 120 per hour
Senior Professional 85 - 105 per hour
Project Professional 70 - 95 per hour
Staff Level II Professional 60 - 80 per hour
Staff Level I Professional 50 - 70 per hour
Technical Support 40 - 70 per hour
Graphics 50 - 70 per hour
Project Support 45 - 70 per hour
Equipment
Highway Vehicle Mileage $ 0 38 per mile
Dedicated Field Vehicle 4000 per day
All Wheel Drive Vehicle 45 00 perday
Printing 0 15 8 5 x 1 1
Field Equipment See Other Side
Laboratory Testing Separate Schedule
Supplies Cost + 10 Percent
Charges for items not ordinarily furnished by AGI such as expendable equipment, rental equipment, subsistence,
travel, tolls, special fees, permits, licenses, photographs, and long distance telephone calls
Outside Services Cost + 15 Percent
Subcontracted services such as boring or excavation contractors, subconsultants, labor, and technical services
Travel
Travel time will be charged at regular hourly rates,portal to portal, not to exceed eight hours per day
Legal
Legal testimony and preparation will be charged at standard rates r 35%
Side 1 of 2 Rev 4199
Field Equipment Schedule of Charges
Category Rate Field Equipment
All equipment normally required for the following activities will be charged at a single daily rate Special Rate Field
Equipment listed below will be charged inaddition There isaone-half day minimum Equipment lists are available upon
request
Equipment Category Day
Sod Sampling During Investigations or Excavation Control S 55 00
Field Moisture-Density Testing, Including Nuclear Gauge 85 00
Surveying Boring or Monitoring Well Locations 40 00
Ground Water Monitoring (Elevation and Subjective Criteria) 30 00
Ground Water Sampling and Testing 45 00
Air Monitoring and Testing 25 00
Vapor Extraction System Monitoring, Operations, and Maintenance 4000
Ground Water Treatment System Monttoring, Operation, and Maintenance 35 00
Personal Protective Equipment - Level D (Per Individual) 30 00
Personal Protective Equipment - Level C (Per Individual) 55 00
Special Rate Field Equipment
The following equipment will be charged on an indiv[dual and unit rate basis There is a one-half day minimum
Equipment Item Day Week Month
Phototon¢atton Detector (OVM, HNU, TIP) 65 00 25000 825 00
Flame Ionization Detector (O\ 4) 75 00 300 00 975 00
Explostmeter 40 00 160 00 525 00
Interface Probe 65 00 260 00 850 00
Dissolved Oxygen Probe 30 00 120 00 40000
Turbidmeter 25 00 100 00 325 00
Electronic Data Logger 50 00 20000 650 00
Electrical Resistivity Meter 30 00 120 00 400 00
Redi-Flo Pump with Converter 10000 400 00 1300 00
Continuous Water Level Recorder 35 00 140 00 45000
Slope Inclinometer I00 00 300 00 900 00
Self Contained Breathing Apparatus (SCBA) 55 00 220 00 725 00
Electrical Generator 45 00 180 00 575 00
Trash Pump 1 0 HP 15 00 6000 200 00
Trash Pump 1 3 HP 25 00 100 00 325 00
Trash Pump 3 0 HP 35 00 14000 450 00
Regenerative Blower 75 00 225 00 65000
Air Compressor 75 00 225 00 65000
Low Flow Sample 100 00 300 00 900 00
Ph Meter 15 00 45 00 12000
R ater Flov, Meter 5 00 15 00 45 00
IR Instrument (excludes S20/sample) l00 00 300 00 900 00