HomeMy WebLinkAboutPK1999-0308 - Other - Modification #1 - AGI Technologies - The Reiman Trust Property Enviornmental Assessment, Phase II - 02/04/2000 CITY OF KENT PARKS AND RECREATION CONTRACT MODIFICATION AGREEMENT NO. ONE PROJECT Reiman Trust Property Environmental Assessment, Phase II CONSULTANT AGI Technolaies DATE January 27 2000 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE PARKS AND RECREATION DEPARTMENT AGREEMENT FOR REIMAN TRUST PROPERTY ENVIRONMENTAL ASSESSMENT, PHASE II (the "Contract") entered into between the City of Kent and AGI Technologies on December 28, 1999 All provisions in the Contract shall remain in full force and effect except as expressly modified by this document Whereas additional services requested are beyond the existing scope of tasks as described in the executed agreement with the City of Kent dated December 28, 1999 the City of Kent and AGI Technologies desire to modify the Contract, $2,500 00 For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows Section II. Pavment, is modified as follows The City shall pay the Consultant based on time and materials an amount not to exceed Two Thousand Five Hundred Dollars and NO/100ths ($2,500 00) for these modifications according to the schedule of charges attached as Exhibit A, which causes the total contract amount based on time and materials, including all agreed upon modifications to be Sixteen Thousand Two Hundred Dollars and NO/100ths (S16.200 00) for the work described in Exhibit A Section III. The Consultant shall evaluate alternative clean-up methods and recommend remedial action The Consultant will complete the work described in this Contract Modification Agreement per telephone conversation of January 24. 2000 in order to meet the City of Kent schedule Consultant accepts all requirements of this Contract Modification by endorsing below Consultant further agrees that this Contract Modification constitutes full payment and final settlement of all claims for contract time and for all costs of any kind, including costs of delays, related to any work either coveted or affected by this Contract Modification The parties whose names appear below swear under penalty of perjury that they are authorized to enter into a contract modification that is binding on the parties of this contract Contract Modification I of 2 01/27/00 AGI Technologies Reiman Environmental Assessment, Phase II IN WITNESS WHEREOF, the parties have executed this Contract Modifications on the day and year first written above AGI TEC NOLOGIES THE CITY OF "ENT BY ; � " BY T ncipal ohn odgson, Par s Director Date Ot—C/ — o0 Contract Modification 2 of 2 01/27/00 AGI Technologies Reiman Environmental Assessment, Phase II Exhibit A AGI TKHNOLOGIES Schedule of Charges Personnel Principal $ 110 - 160 per hour Associate 95 - 120 per hour Senior Professional 85 - 105 per hour Project Professional 70 - 95 per hour Staff Level II Professional 60 - 80 per hour Staff Level I Professional 50 - 70 per hour Technical Support 40 - 70 per hour Graphics 50 - 70 per hour Project Support 45 - 70 per hour Equipment Highway Vehicle Mileage $ 0 38 per mile Dedicated Field Vehicle 4000 per day All Wheel Drive Vehicle 45 00 perday Printing 0 15 8 5 x 1 1 Field Equipment See Other Side Laboratory Testing Separate Schedule Supplies Cost + 10 Percent Charges for items not ordinarily furnished by AGI such as expendable equipment, rental equipment, subsistence, travel, tolls, special fees, permits, licenses, photographs, and long distance telephone calls Outside Services Cost + 15 Percent Subcontracted services such as boring or excavation contractors, subconsultants, labor, and technical services Travel Travel time will be charged at regular hourly rates,portal to portal, not to exceed eight hours per day Legal Legal testimony and preparation will be charged at standard rates r 35% Side 1 of 2 Rev 4199 Field Equipment Schedule of Charges Category Rate Field Equipment All equipment normally required for the following activities will be charged at a single daily rate Special Rate Field Equipment listed below will be charged inaddition There isaone-half day minimum Equipment lists are available upon request Equipment Category Day Sod Sampling During Investigations or Excavation Control S 55 00 Field Moisture-Density Testing, Including Nuclear Gauge 85 00 Surveying Boring or Monitoring Well Locations 40 00 Ground Water Monitoring (Elevation and Subjective Criteria) 30 00 Ground Water Sampling and Testing 45 00 Air Monitoring and Testing 25 00 Vapor Extraction System Monitoring, Operations, and Maintenance 4000 Ground Water Treatment System Monttoring, Operation, and Maintenance 35 00 Personal Protective Equipment - Level D (Per Individual) 30 00 Personal Protective Equipment - Level C (Per Individual) 55 00 Special Rate Field Equipment The following equipment will be charged on an indiv[dual and unit rate basis There is a one-half day minimum Equipment Item Day Week Month Phototon¢atton Detector (OVM, HNU, TIP) 65 00 25000 825 00 Flame Ionization Detector (O\ 4) 75 00 300 00 975 00 Explostmeter 40 00 160 00 525 00 Interface Probe 65 00 260 00 850 00 Dissolved Oxygen Probe 30 00 120 00 40000 Turbidmeter 25 00 100 00 325 00 Electronic Data Logger 50 00 20000 650 00 Electrical Resistivity Meter 30 00 120 00 400 00 Redi-Flo Pump with Converter 10000 400 00 1300 00 Continuous Water Level Recorder 35 00 140 00 45000 Slope Inclinometer I00 00 300 00 900 00 Self Contained Breathing Apparatus (SCBA) 55 00 220 00 725 00 Electrical Generator 45 00 180 00 575 00 Trash Pump 1 0 HP 15 00 6000 200 00 Trash Pump 1 3 HP 25 00 100 00 325 00 Trash Pump 3 0 HP 35 00 14000 450 00 Regenerative Blower 75 00 225 00 65000 Air Compressor 75 00 225 00 65000 Low Flow Sample 100 00 300 00 900 00 Ph Meter 15 00 45 00 12000 R ater Flov, Meter 5 00 15 00 45 00 IR Instrument (excludes S20/sample) l00 00 300 00 900 00 Side 2 of 2 Rev 4199