HomeMy WebLinkAbout4263 Ordinance o . 4263
(Appealing or Repealing Ordinances)
Passed - 12/12/2017
Amending the Kent Comprehensive Plan and its Capital Facilities Element to
reflect a six-year plan for capital improvement projects
ORDINANCE NO. �YJ
AN ORDINANCE of the City Council of the
City of Kent, Washington, amending the Kent
Comprehensive Plan and its Capital Facilities
Element to reflect a six-year plan for capital
improvement projects (2018-2023) (CPA-2017-7).
RECITALS
A. The State of Washington Growth Management Act (GMA)
requires internal consistency among comprehensive plan elements and
the plans from other jurisdictions.
B. To assure that comprehensive plans remain relevant and up
to date, the GMA allows amendments to the capital facilities element of
comprehensive plans concurrently with the adoption or amendment of a
city budget.
C. The City of Kent has established procedures for amending the
Comprehensive Plan in Chapter 12.02 of the Kent City Code (KCC),
allowing amendment of the Capital Facilities Element of the
Comprehensive Plan concurrently with the adoption or amendment of the
City's budget. As part of these procedures the City Council may hold the
1 Comprehensive Plan Amendment
to the Capital Facilities Element for
20I8-2023 Capital Improvements
public hearing instead of the Land Use and Planning Board. KCC
12.02.010.
D. The City of Kent Finance Department has submitted proposed
amendments to the Capital Facilities Element of the Comprehensive Plan
to identify a six-year plan for capital improvement projects, including
costs and revenue sources.
E. On October 3, 2017, the City provided the State of
Washington the required 60 day notification under RCW 36.70A.106 of the
City's proposed amendment to the Capital Facilities Element of the
Comprehensive Plan. The 60 day notice period has passed.
F. On October 3, 2017, the City's SEPA responsible official
issued a SEPA Addendum to existing environmental documents consisting
of the City of Kent Comprehensive Plan Review and Midway Subarea
Planned Action Environmental Impact Statement (EIS) Draft and Final
(ENV-2010-3) and the Downtown Subarea Action Plan Supplemental EIS
Draft and Final (ENV-2012-30). The SEPA Addendum explained that the
proposed amendment would not create unavoidable impacts beyond those
previously identified in the EIS.
G. After providing appropriate public notice, the City Council of
the City of Kent conducted a public hearing on October 17, 2017, to
consider the six-year plan for capital improvements and the requested
amendment to the Comprehensive Plan and its Capital Facilities Element.
H. On December 12, 2017, the City Council for the City of Kent
approved the Capital Facilities Element amendment to the Kent
2 Comprehensive Plan Amendment
to the Capital Facilities Element for
20I8-2023 Capital Improvements
Comprehensive Plan (CPA-2017-7) to reflect a six-year plan for capital
improvement projects (2018-2023).
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF KENT,
WASHINGTON, DOES HEREBY ORDAIN AS FOLLOWS:
ORDINANCE
SECTION 1. - Amendment. The City of Kent Comprehensive Plan
and its Capital Facilities Element are hereby amended to reflect a six-year
plan for capital improvement projects (2018-2023), as set forth in Exhibit
"A" attached and incorporated by this reference (CPA-2017-7).
SECTION 2. Corrections by City Clerk or Code Reviser. Upon
approval of the city attorney, the city clerk and the code reviser are
authorized to make necessary corrections to this ordinance, including the
correction of clerical errors; ordinance, section, or subsection numbering;
or references to other local, state, or federal laws, codes, rules, or
regulations.
SECTION 3. - Severabilitv. If any one or more section, subsection,
or sentence of this ordinance is held to be unconstitutional or invalid, such
decision shall not affect the validity of the remaining portion of this
ordinance and the same shall remain in full force and effect.
SECTION 4. - Effective Date. This ordinance shall take effect and
be in force 30 days from and after its passage, as provided by law.
3 Comprehensive Plan Amendment
to the Capital Facilities Element for
2018-2023 Capital Improvements
rE OKE, MAYOR Date
ATTEST:
KIMBERLEY KOMOTO, CITY CLERK Date Ad pte
I -LI k5 - 1
Date Published
APPROVED AS TO FORM:
°" 1 A .
TO BRUBAKE , CITY ATTORNEY
P:\Civil\Ordinance\Compplanamend-Capitalimproveplan 2018,Docx
4 Comprehensive Plan Amendment
to the Capital Facilities Element for
2018-2023 Capital Improvements
Jr
f
i
EXHIBIT A
November 27, 2017
KENT
WASMINCTON ��
off/�j
r,
440
/! KENT
WASHINGTON
f
,ice,
CAPITAL I � PROGRAM
.......... ............ .... .......... . .. .....,. ...... .....__._ ....._... ............ ..........
2018-2023 SUMMARY PROJECTS AND FUNDING
Capital project costs for the City's 2018-2023 capital planning period total $281.5 million and are funded with
City,utility and other resources, as illustrated in the following tables. Additional details follow.
/
�Gi�%/i/,r�ir/ri/��j��j/ii
City Resources 27,959 60,947 88,906
Utility Resources 19,800 85,590 105,390
Other Resources 4,940 87,561 92,501
Total-in thousands 52,699 234,098 286,797
General Government 4,638 9,293 13,931 ��
Parks, Rec&Comm Services 15,440 35,305 50,745 ;,
Transportation 13,421 94,500 107,921
Utilities 19,200 95,000 114,200
Total in thousands 52,
699 234,098 286,797 /
r u%r
Sources of Funds �
Other
City Resources
Resources 31% ' 6
32%
utility
Resoourcurc
es
37%
Projects by Category j
Transportation '!
37%
Parks,Rec& ''
Comm Services
15%o I '
Utilities
General
60% �/
Government
5%
1
CAPITAL IMPROVEMENT
OPERATING IMPACT OF MAJOR CIP PROJECTS
The impact of a capital project on the operating budget is a key factor in considering the inclusion of a project
in the six-year plan. The operating costs of a project,and any savings resulting from the project,are captured
Rw in the Operating Budget.
SOURCES OF FUNDS-in thousands
City Resources�
Streets-B&OTax 8,000 6,880 6,880 6,880 6,880 5,755 41,275
CRF-Parks REET2 4,700 1,000 1,000 1,000 1,000 1,000 9,700
Capital Resources Fund 4,950 - - - - 4,950
Facilities Fund 591 550 550 555 799 555 3,600
�r1
General Fund 6,150 - - - - - 6,150
Information Technology Fund 547 1,697 1,797 2,335 - - 6,376
rr / Streets-Solid Waste Utility Tax 2,850 2,746 2,772 2,772 2,772 2,772 16,684
Street Fund 171 - - - - - 171
Total City Resources 27,959 12,873 12,999 13,542 11,451 10,082 88,906
J r%
Utility Resources
Drainage Utility 8,550 8,000 8,000 8,000 8,000 8,000 48,550
/ Sewer Utility 3,500 3,750 4,440 4,900 5,000 5,000 26,590
Water Utility 7,750 4,500 4,500 4,500 4,500 4,500 30,250
Total Utility Resources 19,800 16,250 16,940 17,400 17,500 17,500 105,390
Other Resources
Fuel Tax 10 - - - - - 10
Grants -1,000 500 500 500 500 3,000
r GO Bonds 1,000 - - - - 1,000
Funding Gap 2,930 19,054 17,158 16,878 16,113 16,358 88,491
Total Other Resources 4,940 19,554 17,658 17,378 16,613 16,358 92,501
/ r
/ Total Sources of Funds 52,699 48,677 47,597 48,320 45,564 43,940 286,797
rj
2
CAPITAL IMPROVEMENTPROGRAM
SUMMARY BY SOURCE 2018.2023
$in Thousands
50,000 ._,,,,,. ............. ............... .. ...... ...... .......
45,00040,000
...r _...
mwr
35,000
30,000
p6p Other Resources
1 25,000 - he Utility Resources20,000
tiq City Resources
15,000
10,000 --
r
5,000 .... .. _ ._ .._ �a,u
2018 2019 2020 2021 2022 2023
l
2017-18 SOURCES BY FUND TYPE
Sewerutuity
9%
r
Drainage
4% Other Resources
1
4�u Water Utility
16%
Streets Other Facilities Fund � p
Solid Waste 414 %/ ���%., .�,....:... .��w� 2%
t
Information
Technology
Fund ' Street Fund
- $preels 9% Tax
3% u� 19% s�mnr✓wva4mrw,vnnrdrrW✓aswE �'9%�
General Fund oll/ �m
Capital Resources CRF-Parks
Fund BEET 2 1
i
c.
c
3
CAPITAL IMPROVEMENT
PROJECTS-in thousands
General Government
Facilities 591 805 650 605 849 555 4,055
Fleet 1,750 - - - - - 1,750
Technology 1,797 1,697 1,797 2,335 - - 7,626
Strategic Investments 500 - - - - 500
Total General Government 4,638 2,502 2,447 2,940 849 555 13,931
J Parks,Rec&Comm Services
Programs 195 1,710 735 915 300 195 4,050
Planning&Design 90 90 190 190 90 1,090 1,740
Redevelopment&Renovations 5,655 5,750 5,100 1,150 2,600 4,600 24,855
Development 9,000 - 500 4,500 3,100 - 17,100
/i Acquisitions 500 500 500 500 500 500 3,000
Total Parks,Rec&Comm Svcs 15,440 8,050 7,025 7,255 6,590 6,385 50,745
Transportation
/
Site Improvements 13,421 19,125 19,125 19,125 19,125 18,000 107,921
f/o Total Transportation 13,421 19,125 19,125 19,125 19,125 18,000 107,921
Utilities
Water Supply&Distribution 7,750 6,000 6,000 6,000 6,000 6,000 37,750
Sewer 3,500 5,000 5,000 5,000 5,000 5,000 28,500
Stormwater Management 7,950 8,000 8,000 8,000 8,000 8,000 47,950
of //
Total Utilities 19,200 19,000 19,000 19,000 19,000 19,000 114,200
Total Protects 52,699 48,677 47,597 48,320 45,564 43,940 286,797
�,,,�� li/////,//%//%//%/i�l////%/i///////////%/,/,//%//%///%/%L%/i/,�///1%//i/�il%/%%/%/�/%/l% ///////ifl%%///////�„%ii%�/iorc,i,,!i%!c✓///i%.,cL�%fi,/%�!//i%///,/%6,/%/%%%
4
�° 'IAL IMPROVEMENT PROGRAM
III
SUMMARY BY CREGORY2018-2023
$in Thousands
50,000
45,000 _._.._ ....._... ..... ,,.
2 .._....,
40,000 .. ..... ......_...
Ftl Utilities
I 35,000 —.. .. .... ..... . Iw
a r
30,000
j 5,000 r�
1nTransportation j
20,000 .N�� ..�. ,w��M� ,,. ..._ .. ......�.� Servicesc&Comm
� 15,000 (� � r ����� "' HGeneral Government
10,000
....... 2015 2019 2020 2021 2022 2023 .._. .._.
2017-18BYCATEGORYFUNCTION
Redevelopment & Sewer
Renovations 9/° owl
° r-` ater
13/° 1 Storm water
Management
18/o
1 Technolog Facilities
4% Other 1 �
Water Supply ri JYCqutisrClorY5
7%1
&DisVibution Pro rams /rll r;
2% Site Improvements
36/°
r
5
_..............
CAPITAL T PROGRAM
GENERAL GOVERNMENT-in thousands
j��lrrr//////i�•� /gyp r r / � r rip ri r r//ri ri r r rr a% r rl ///c/ r r ooi: /
aw �/��/%�/�����1/ice//�///,���,//,i`l% iJ/i/i//%%%%%/%/%/%���;;�//�////i�%///i�i)J9✓%�i� �/riiii%//�„�:r��j i� ,°p%��,io�,;�iiiii/ 5„�,//�/i�,r�iri,,
Sources of Funds
CRF General 1,750 1,750
Facilities Fund 591 550 550 555 799 555 3,600
Fleet Fund 1,750 1,750
Information Technology Fund 547 1,697 1,797 2,335 6,376
Funding Gap 255 100 50 50 455
Total Sources of Funds 4,638 2,502 2,447 2,940 849 555 13,931
Projects
Facilities
Kitchen Equipment(Lifecycle) 20 20 30 25 25 25 145
Centennial Center Reseal 50 50
/ o /
Facilities Card Access 114 114
/ J
Corrections Portable Backup Power Conn. 50 50
✓� Tenants Requested Renovations 50 50 50 50 200
Kent Pool Lifecycle 25 25 25 25 25 25 150
Emergency Facility Repairs 47 100 100 100 100 104 551
i Roof Repairs(Lifecycle) 35 400 145 55 450 330 1,415
Floor Covering Replacements(Lifecycle) 200 60 100 20 30 410
f�;Pl Parking Lots(Lifecycle) - 100 55 54 71 280
/jl�10 HVAC Replacements(Lifecycle) 100 100 100 275 115 - 690
Total Facilities Projects 591 805 650 605 849 555 4,055
Fleet
Fuel Island Phase 1 (Portable) 1,050 1,050
Fuel Island Phase 2(Partially Portable) 700 700
Total Fleet Projects 1,750 1,750
�s
,.,
Technology
Software Lifecycle 768 875 975 1,513 4,131
Hardware Lifecycle 622 622 622 1,866
Tech Plan 200 200 200 600
Permitting System Replacement(KIVA) 419 419
eFax/Email/File Record Retention Mgmt 50 50
Data&Records Mgm[Dashboard&Collab 35 35
Intranet Redesign 50 SO
Avanti System Replacement 250 250
/vm
Online Resident Engagement Tool Analysis
Parks Dashboard 150 150
Communications Dashboard 75 75
Total Technology Projects 1,797 1,697 1,797 2,335 7,626
Strategic Investment Projects
�d.
9
Place Makin Meet Me On Meeker 450 450
Downtown Strategic Action Plan Imp 50 - - 50
Total Strategic Investment Projects 500 - - - Soo
Total Projects 4,638 2,502 2,447 2,940 849 555 13,931
6
CAPITALM
PARKS, RECREATION &COMMUNITY SERVICES-in thousands
mu&
Sources of Funds
CRF REET2 4,700 1,000 1,000 1,000 1,000 1,000 9,700
Grants-Washington State 1,000 500 500 500 500 - 3,000
Drainage Revenues 600 600
Street Operating Fund 1,000 1,000
General Fund 2,000 2,000
Fuel Tax 10 10
CRF General 3,200 3,200
Wndin Ga 2,930 6,550 5,525 5,755 5,090 5,385 31,235
9 P
Total Sources of Funds 15,440 8,050 7,025 7,255 6,590 6,385 50,745 /
Projects
Programs ,
Golf Maintenance Equipment Replacement 150 150 150 450 �
DR Building Renovations and Improvements 100 100 �
Irrigation System Upgrades 630 100 730kJ
Golf Course Renovations and Improvements 335 230 120 105 790
Golf Course Accessories 115 115
Clubhouse Renovations and Improvements 185 10 195
Tournament Pavilion 50 450 500 /�/
Green Kent 150 150 150 150 150 150 900rr� //
Adopt-A-Park 25 25 25 25 25 25 150
Eagle Scout Volunteer Program 10 10 10 10 10 10 60Paths
d Trails Reinvestment Program 5 1,710 735 9155 300 195 0 10 10 10 10 10 60
Total Programs 19 4,050 '
Planning
n g&Design
Master Plans
50 50 50 50 50 50 300
Architect/Engineering 40 40 40 40 40 40 240
Mill Creek Canyon Trails Design 100 1,000 1,100 e ,
Hogan Park at Russell Road Ph II Design - - 100 - 1000
Total Planning&Design 90 �90 190 190 90 1,090 1,740 �
Redevelopment&Renovations
Lifecycle 580 500 500 500 500 500 3,080
West Fenwick Park Renovation Phase 2 1,375 1,375
Kent Memorial Park Renovation 1,100 1,100 r
Springwood Park Renovation 1,700 2,500 4,200
v
Chestnut Ridge Playground 200 200
Old Fishing Hole Improvements 300 300 � �G
First Avenue Lunar Rover-Phase 1 250 250
Eastridge Renovation 100 100
l
Mill Creek Earthworks Renovation 100 1,100 1,200 OO�/
r-
North Meridian Park Renovation Phase I 50 850 900
7
CAPITAL I E, NI
Interurban Trail,3 Friends Fishing Hole 400 400
First Avenue Lunar Rover-Phase II 300 300
Garrison Creek Park Renovation 400 400
Glenn Nelson Park Renovation 50 350 400
Lake Fenwick Park Renovation-Phase II 200 2,400 2,600
Uplands Playfie Id Renovation-Construct 1,350 1,350
Park Orchard Park Renovation 50 300 350
Hogan Park at Russell Road Reno.Ph II 1,500 1,500
Kherson Urban Play 300 300
Green River Trail/Van Doren's Landing 2,500 2,500
Downtown Place-Makin Program-Showare 350 350 ki 9
Meeker Street Place-Making 250 250
Frager Ped Bridge Rest Stop/Russell Wood 250 250
Sun Meadows Improvements 150 150
Downtown Place Mking-Burlington/Kaibar 150 150
n„
NPR-Scenic Hill Park Renovation 400 400
I
KVLT-Boeing Rock Improvements 200 200
/ Downtown Place Mking-Titus/Kherson 100 100
Lake Meridian Park Renovations 100 100
Campus Park Renovation 100 100
r
r Total Redevelopment&Renovations 5,655 5,750 5,100 1,150 2,600 4,600 24,855
Development
YMCA 9,000 9,000
a Huse/Panther Lake Community Park 2,800 3,100 5,900
Clark Lake Park Development 240th - - 500 1,700 - w 2,200
l H Total Development 9,000 500 4,500 3,100 17,100
Acquisition
i
Strategic Acquisitions 500 500 500 SOD 500 500 3,000
Total Acquisitions 500 500 500 500 500 500 3,000
Total Protects 15,440 8,050 7,025 7,255 6,590 6,385 50,745
�.,f� ✓/,//'//l//„//�i%//,,,/sir/a//cl////�,,,iu,,,%,.//%r„l/////,!v////c!�%�llo/iic///�i/a%//i/i�✓//,i///�,Gm,//,�/i//„////,,,,�//!,/��/%„,//ii�/,il////,
r,
/ j
8
............. ............... ..
CAPITALIMPROVEMENer PROGRAM
TRANSPORTATION-in thousands
Sources of Funds
Solid Waste Uti lity Tax 2,850 2,746 2,772 2,772 2,772 2,772 16,684
Business&Occupation Tax 8,000 6,880 6,880 6,880 6,880 5,755 41,275
Capital Resources Fund 2,400 2,400
Street Operating Fund 171 171
Funding Gap 9,499 9,473 9,473 9,473 9,473 47,391
Total Sources of Funds 13,421 19,125 19,125 19,125 19,125 18,000 107,921
Projects
Traffic controllers,signals&cameras 700 700 700 700 700 3,500
Pavement Preservation 6,860 6,834 6,834 6,834 6,834 34,196 /��%/��
Pavement Preservation B&O 4,044 4,044 4,044 4,044 4,044 20,220
Pavement Preservation SW Util Tax 2,596 2,622 2,622 2,622 2,622 13,084
Bridges 1,200 1,200 1,200 1,200 1,200 6,000
Quiet Zone Improvements 2,700 2,700
132nd Ave Pedestrian Improvements 121 121 h /
p 1�
Concrete Replacement Program 700 2,000 2,000 2,000 2,000 2,000 10,700
James Street Concrete Street 1,000 1,000
5212tfi St Bridge @Green River 400 400
5212tfi Way Overlay 350 350
Pavement Striping&Loops 350 225 225 225 225 1,250
Thermoplastic Markings 215 400 400 400 400 1,815 /'
JJ
o"
Residential ADA,Sidewalk,Ramps 200 200
Residential Crack Sealing 130 130 /�
Guardrai9Repair/Replace 110 100 100 100 100 510
sRepair
� -
Street Signs air/Re lace 250 200 200 200 200 1,050 ��
Street Lights Repair/Replace 100 100 100 100 100 100 600 /
Crack Sealing Roadways 125 200 200 200 200 925
Street Tree Replacement&Mtc 375 375
Pavement Rating Consultant 75 75
�j
Sidewalk,Walking Path,ADA Impv/Plan 450 450
Inlay-SE 248th St 60 60 /
Inlay-124th Ave SE 60 60
Overlay-108th Ave SE 60 60
Overlay-North Peak Crest 60 60j/��
Overlay- PI 55 55 )J �
Overlay-There Theresa Terrace 60 60 f��r n
Overlay- 105th Ave SE SO 50
i 1
Overlay- st Ave SE 60 60
Overlay 12121 st PI SE 55 55
Overlay 103rd PI SE-SE 204th St 100 100
Overlay hod 0 0
Overlay SE 268th 550 550 �
Overlay Meridian Glen 900 900 /
Street Lights-New 200 200 200 200 200 200 1,200
Flashing Yellow L Turn Ph.3,4&5 200 200
Traffic Signal Controller Cab/Parts 300 300
Crosswalk Safety Improvements 150 150 150 150 150 150 900
Residential Traffic Calming 150 150 150 150 150 150 900
E.Valley Hwy 196th- 180th 1,400 1,400
S 212th St/S 208th St 1,000 1,000 �/ r
Total Projects 13,421 19,125 19,125 19,125 19,125 18,000 107,921
9
CAPITAL MENT PROGRAM
UTILITIES-In thousands
Sources of Funds
Water Revenues 7,750 4,500 4,500 4,500 4,500 4,500 30,250
Sewer Revenues 3,500 3,750 4,440 4,900 5,000 5,000 26,590
is Drainage Revenues 7,950 8,000 8,000 8,000 8,000 8,000 47,950
w
Funding Gap 2,750 2,060 1,600 1,500 1,500 9,410
Total Sources of Funds 19,200 19,000 19,000 19,000 19,000 19,000 114,200
Projects
Water Supply&Distribution
Water Conservation 100 100 100 100 100 500
Water Generators 100 100 100 100 100 500
If Reservoir Maintenance&Improvements 500 Soo 500 500 500 2,500
Water Main Re pairs/Replacements 2,500 2,500 2,500 2,500 2,500 12,500
Hydrant Replacements 50 50 50 50 50 250
9 j Lar eMeter&Vault Replacements 100 100 100 100 100 500/
Habitat Conservation Plan Implementation 2,450 300 300 300 300 300 3,950
Pump Station Electrical Upgrades 150 150
>/
Misc Water;Piping Upgrades 500 550 550 550 550 550 3,250
7� Wellhead Protection 100 100 100 100 100 100 600
Security Improvements on Water Sites 50 50 50 50 50 50 300
%df Water Zone Improvements 1,500 1,500 1,500 1,500 1,500 7,500
E.Hill Pressure Zone PRV's 1,000 1,000
Landsburg Mine 100 100 100 100 100 500
I /QP� Tacoma Pipeline 50 50 50 50 50 250
rrII/ Derbyshire Water Main Replacements 3,000 3,000
224th St Phase II 500 500
�r Total Water Supply&Distribution 7,750 6,000 6,000 6,000 6,000 6,000 37,750
j/
Sewer
/
Sewer Pipe Replacements 2,500 3,500 3,500 3,500 3,500 3,500 20,000
/ P Pum Station Repairs&Replacements 500 1,500 1,500 1,500 1,500 1,500 8,000
Linda Heights Pump Station 500 500
Total Sewer 3,500 5,000 5,000 5,000 5,000 5,000 28,500
Stormwater Management
Green River Levee Repair 6,180 6,175 6,000 6,000 6,000 30,355
NPDES 200 220 225 230 230 230 1,335
(� Drainage Master Plan 200 200
Mill/Garrison/Spring/Grn,Rive r&Tries 1,000 1,000 1,170 1,170 1,170 5,510
Valley Creek System CLOMR 50 50
Upper MITI Creek Dam 400 400
144th Ave Drainage Improvements 200 200
Mill Creek @ 76th Ave Flood Protection 1,000 1,000
Lower Russell Road Levee 100 100
/ Valley Channel RehabilltaUon 1,200 1,200
Mill Creek Culverts 300 300
i Misc Drainage;Large Pip a/Culvert 300 600 600 600 600 600 3,300
�1 S 224th St.Phase 2 1,000 1,000
W.Meeker Storm(RR-64th) 1,000 1,000
/ GRNRA 5 Pump Station 2,000 - - - - - 2,000
Total Stormwater Management 7,950 8,000 8,000 8,000 8,000 8,000 47,950
Total Projects 19,200 19,000 19,000 79,000 19,000 19,000 774,200
NO,e�a 10✓aai/opt/i//,Op/iva//O//a1/,00%1veD0/le„e0i/O///C/22�iLoiv,�//O/iirro//li/�lO�¢OCL9/!r
10
z i— am -6o6 mL,' ZL`c - o tn� n$ E u°_°m� QL'E_.n = Esau QLco� E -- . t � o
wws'c'- Q s„ v_a9 d',c�o.N�dL v v vMi -E u� 3°' a;
0 �2 `gym
EE' ° �a
ZoU75 mm�aom tiE ZOV�,rcN �o
W Wsav V °' v� d 3a v� m °� u `.q9 ZZ ..�a °' o Q u ZZ.E ;doL " °m o g L yo
UU �°L � o` o UV -ErvbuE Eoor3 00
y --
N O 9 C lJ O C -O'O E P ON E•O A... C �4.. ° OL ?G Ou O G d�'�- N
OO
o.ECC omD'y F+ct SCC oc Ew `a moF Ac OO
3�G�zloitloo���, �� �'W Lao A'_ c'vdE VEFc Q >, `Y'U� u
ro OOV3 GL m3R'_ V3� o `� 5$rv ° 3 �roP4 C4 V'�-L nmEmE °a ACC V3'o..tECma n._ EaV a0
.o c ....a h r $
m o Y m m m- d o ° €b o0 0
� �9 QViY JV� dN9 �V� ENO�Nti IC t�•d iQV� OO GL � CS e LL EJ�.�JLL�t
,omoa mV'.v_.9 E � E-& m Qww yo v� oFv
smm °' Q E E E EE `�'E
oV�.a `°v `n'smo `"° Gw E ��xu ` c v c > ORO ° o9 a9i„r
Em "•YU Z a.d O..,� u oZ c, E-„'VV v Z' OoE_ odc akun E-E �nEa .c mvcE_ J
co A W W E W W 5 m c E _ E n W W 5 ° E c W r a E E ° Eon E E �
c UU o£CnJ `� UU .L us'm�. Ew4 rdUU,.. E cc `o UUsm om`�°� ° Eo ooE 55
�`Ea ZLoo Eta ZZoa L' Ev�oEc E7_.7_ op &' ° `�"' n ZZ oL �w ca �a eau Eno `v.E
c dQ o ,. 'a c QQ wu
o .� .Z. h qZq z.= .E.co r` o j3Z Z000i",E- o - G z5-y R - Eo � ro gco
Ha- ❑❑ �Nna.N = 3aQ �t.o zmc.�'c',`-OGcN� ai= c"� .. C .�aU"tia op�tpoc��� ` AS G_ ,'9 6 s�.NEH
'o `v 3CCL cm - sL'o � Cc `�-m'o c�^' � osCCCcmoc -al�L'o 3CCvv� iT`- tJ'C L' >'h �.bw"tFL-
E O V 3 h E 5-E u.r E n O O V 5 o E'r m m�"O O AL-".>V S m E aao m
t•-� 7 QoFavm `E � `c°.c QVYxU�-Eo v °.c QUVca¢O
Ud0 E L N E
rZ EoV N �� m ° off m u Ew oo'a < uwro
W,� v NF3
E:-2-7
✓
o `c° Eo46 mom CoUaE
FEE 9E^ F
W y*,0 9 0 vEi E ro W W E ^u: o
U Ooz
Z0.Ua EQQs-A `� orn'�"cca i;Q ° Os-� � �roQQoOs= Y
Q " o� ez r zZ_ c G m " m mV fl„ 4 )
O Rppq o '-.viv " '� s .. L^❑ cL nt....K $' Q� ct nw s F"P ! "1. P
Z Q-Y43 GGLL o "' bb ohL-�� �y CCCo onNOUr'o,m
o00'o ommV EW_°OV3V-"' mn�. `�m_OOV3V-_ ooab ._`,. i ,� � •y
D.
ra j
O .0 c3 ro ro
3 .° G
°uj
V r7 1.M p., •^ cad U N •� 0 O ;a
a� ,� v, O ., ro ❑ :� V cv O aS O
O
� W W .
!Y a
Outo ° c3 �
W F � a 3 ro � cx ',� ' 71
�
Z to gu �1-. roti0 ° � � ° '' � "' G
n � ro � w ? oca � pO � c3bu
e
U —z a � ati �'
°°° c o 10
O ad oua [ uzw .� 3 E� F 7 � 0L)